• Products
    • Ultra-Span®
    • TradeReady®
    • WallSolutions™
    • Case Studies
    • Request a Catalog
Quick Links
  • Architect / Engineer ›
    • Detail Library
    • Specification Creator
    • Case Studies
    • Building Green
    • AIA Continuing Education
    • How Aegis Assists Architects / Engineers
  • Contractor ›
    • Detail Library
    • Download Installation Video
    • Locate a Fabricator
    • How Aegis Assists Contractors
  • Fabricator ›
    • Products
    • Detail Library
    • Request Software Demonstration
    • How Aegis Assists Fabricators
Aegis Metal Framing
PRODUCTS · TECHNICAL
ABOUT AEGIS · CONTACT AEGIS
MEDIA · BUILDING GREEN · BLOG
CONNECT WITH US Visit Aegis Metal Framing on Facebook Watch Aegis Metal Framing Videos on Youtube Visit Aegis Metal Framing on LinkedIn Follow Aegis Metal Framing on Twitter
Header
Home » Products: Cold Formed Steel » Case Studies » Infrastructure
North Cape RO Water Treatment Plant North Cape RO Water Treatment Plant
Cape Coral, Florida - Crowther Roofing and Sheet Metal
  • Five buildings totaling 67,000 sq. ft. of trusses
  • 92 foot clear span trusses with 4' overhangs
  • Download the case study PDF

Valley Creek Waste Water Treatment Plant Valley Creek Waste Water Treatment Plant
Bessemer, Alabama - Bama Truss and Components
  • 50,000 sq. ft. roof; 84 ft clear span
  • 100 ft. deep pump pit scaffold install
  • Base trusses piggyback metal deck
© 2006 Aegis Metal Framing · 14515 North Outer 40, Suite 110 · Chesterfield, MO 63017 · (314) 851-2200 · (866) 902-3447
Home · Contact Aegis · AIA Continuing Education · Affiliations / Links · Family of Companies ·Site Map · Request a Catalog · Manager ·